History of Smartop
201609Developed and delivered the No. 3 clutch gear inspection equipment
Developed and delivered the screw thread inspection equipment
08Developed and delivered the laser marking equipment
Developed and delivered the automatic welding line location inspection equipment
07Developed and delivered the No. 2 caulking production automation line
06Developed and delivered the drive hall inspection equipment
05Developed and delivered the washer omission inspection equipment
04Developed and delivered the gauge inspection equipment
03Developed and delivered the missing parts inspection equipment
02Developed and delivered the No. 1 and No. 2 pulley size measurement testing equipment
01Established the Laser Marker Development Division
Developed and delivered the No. 1 caulking production automation line
201512Developed and delivered the bolt check/size measuring equipment
11Developed and delivered the No. 1 and No. 2 caulking inspection equipment
10Developed and delivered the 3D vision DIA/SP measuring equipment
09Developed and delivered the incorrect item inspection equipment
07Developed and delivered the grease spread volume inspection equipment
06Developed and delivered the missing parts inspection equipment
05Developed and delivered the warmer testing equipment
04Signed the second export contract with BOE in China for the LCD glass inspection equipment repair
03Developed and delivere the coil fuse location inspection equipment
02Lee Ilgyu was appointed as the CEO
01Developed and delivere the pulley inspection equipment
Developed and delivere the coil inspection equipment
201411Developed and delivere the hood latch gap inspection equipment
10Signed the first export contract with BOE in China for the LCD glass inspection equipment repair
09Developed and delivere the clutch gear inspection equipment
07Developed and delivere the door latch inspection equipment
05The company research lab was established
04Moved into the MJ Techno Park
03SMARTOP Corporation was established (with KRW300 million in capital)